
Madington Station DCO & Cutting Production Time
Case / Amedia
“What used to take several hours now takes just minutes. With Madington DCO, I can deliver around 40 creatives in one go, without relying on others. It’s a huge shift in efficiency.”

The Outcome
Less friction, more scale, dynamic creative control and most important - More time for creativity.
Key Results
95% Time Saved
Production time reduced from 4–5 hours to ~10 minutes
Fewer errors and increased team autonomy
For Hanne-Mari at Amedia, the move to automated Double Fullscreen formats in Madington Station didn’t just speed things up, it changed the way her team works. She now builds and sends 40 ad units in under 10 minutes, instead of spending 4 to 5 hours.
How?
Producing 20 desktop and 20 mobile formats manually is time-consuming, especially when each version has to be uploaded, tracked, and trafficked separately. With Station, everything happens in one streamlined flow due to how DCO works inside the platform.
By building dynamic structures once, Amedia no longer needs to upload individual files per publication. The output adapts based on the feed. That alone removes a large share of the manual work — and reduces common errors like misnamed files or mismatched formats.
Why It Works
Here’s what changed for Amedia:
40 Double Fullscreen formats — sent in minutes, not hours
Manual steps removed from the entire creative flow
Time saved across both design and AdOps
DCO replaces repetitive work with one adaptable setup
Less dependency between teams, fewer bottlenecks
Fewer human errors — no broken files, no renaming issues